Foundation concrete delivery
Which concrete mix should I use for foundations?
Do not select it only by price. Use the mix specified for the foundation and ground conditions by the responsible designer or contractor.

Foundation concrete delivery — planning the work
For foundation concrete delivery, the specified mix, quantity and delivery sequence need to suit the planned use. Check vehicle access and how the load will reach the placing point before confirming delivery.
More questions
about this service.
Should foundations be inspected before delivery?
Establish needed inspections and approvals with the responsible contractor or building control contact before ordering the pour.
How is trench volume calculated?
Excavation irregularities can change the needed quantity. Measure the actual length, width and designed concrete depth for each section.
Can a mixer discharge straight into the trenches?
A pump may be needed for trenches beyond direct access. Only where safe vehicle standing and chute reach permit.
What should be covered at handover?
Check delivery details, quantity and agreed supply records.
Foundation concrete delivery by area
Select a place to view this service for that location. Please provide the postcode when you enquire.