Rapid-set concrete delivery
Does rapid-set mean the area can reopen immediately?
Return to service depends on the specified material, achieved strength, conditions and intended loading. Follow the approved repair plan.

Rapid-set concrete delivery — planning the work
For rapid-set concrete delivery, the specified mix, quantity and delivery sequence need to suit the planned use. Check vehicle access and how the load will reach the placing point before confirming delivery.
More questions
about this service.
Is rapid-set concrete always available for delivery?
Establish an appropriate product and delivery arrangement before scheduling work. Availability depends on the material and supplying plant.
Is rapid setting the same as high early strength?
A material may set quickly without meeting the load capacity needed for reopening. State the performance your project requires.
Why must the repair be ready before arrival?
Have the repair, access, tools and crew prepared before dispatch. The usable working time may be shorter than for a conventional mix.
What should be covered at handover?
Check delivery details, quantity and agreed supply records.
Rapid-set concrete delivery by area
Select a place to view this service for that location. Please provide the postcode when you enquire.